Cabin braced and strengthened prior to cutting. The cabin was raised 25cm. Sections of cabin removed and new steel cut and welded in. New cabin sides fitted then new roof beams and roof welding in.
Cabin braced and strengthened prior to cutting. The cabin was raised 25cm.